Primarily used for large public, commercial and industrial developments as well as transport infrastructure projects, we are one of the largest contractors in this field, with specialist expertise in delivering large, complex and technically challenging projects.
In addition to the basic technique we utilise specialist adaptations to suit certain ground conditions or site requirements such as oscillator piles where minimal disturbance is critical; top down construction which enables above ground building to commence at the same time as the basement levels to reduce the programme; under reams for very high loads and drilling fluids such as bentonite and vinyl polymer, where the bore requires support during excavation.
In the video below, Steve Bauld explains the piling works at the One Nine Elms construction project in Vauxhall, London.
View our technical data sheets below: